Connections and dimensional drawings
Pipe dimensions for the ECO suction gas line:
- GED60120 .. GED60235: 3/8”
- GED80295 .. GED80421: 1/2”
For systems with distances > 1 m between the liquid subcooler and the ECO connection at the compressor, one size larger pipe dimensions are recommended!
ECO port connection sizes:
- for GED60120 .. GED60235:
- 7/16-20 SAE O-ring thread
- 1/4 inch (3/8 OD) copper braze
- for GED80295 .. GED80421:
- 9/16-18 SAE O-ring thread
- 3/8 inch (1/2 OD) copper braze
A (mm) | B (mm) | |
GED60120 .. GED60182 | 557 | 520 |
GED60235 | 564 | 526 |
Connection positions | |
---|---|
1 | High pressure measurement connection (HP) – Schrader |
2 | High pressure connection (HP) |
3 | Low pressure connection (LP) |
4 | Sight glass |
5 | Oil maintenance connection |
6 | Connection for oil and gas |
7 | Mounting position for vibration dampers |
8 | Mounting position for Tandem and Trio fixing rails |
10 | Economiser (ECO) connection - ORBIT FIT only |
11 | Earth connection for housing |
A | Connection for control cable |
B- | Motor connection (-) |
B+ | Motor connection (+) |
C | Compressor fixing |
SL | Suction gas line |
DL | Discharge gas line |
Dimensions (if specified) may have tolerances according to EN ISO 13920-B.
The legend applies to all BITZER scroll compressors and includes connection positions that do not exist in every compressor series.