Before commissioning, check tightness
Check the refrigerant circuit (assembly) for tightness, as a whole or in parts, according to EN378-2 or other applicable equivalent safety standards. For this, create excess pressure, preferably using dried nitrogen.
- Do not exceed the maximum allowable pressures, see name plate.