Connecting the OLM-IQ actuator sensor unit (B43 and M41) electrically to the CM-RC-01

Sensor of oil level controller (B43)

  1. Connect the three-core sensor cable to terminal strip CN7 on the CM-RC-01 according to schematic wiring diagrams: brown to CN7:5, blue to CN7:6 and black to CN7:7.
  2. Plug in the cable coupling of the sensor and screw it.

Solenoid valve for oil return (M41)

  1. Connect the two-core signal cable of the solenoid valve on the CM-RC-01 to terminal strip CN5 according to schematic wiring diagrams: brown to CN6:5, blue to CN6:6.
  2. Connect the protective earth conductor to the earth terminal strip.
  3. Plug in the cable coupling on the actuator sensor unit and screw it tight.