Necessary preparations before retrofit of R22 to alternative refrigerants

Checklist 1: Note conditions before retrofit

Design operating conditions or application range, like medium temperature or low temperature refrigeration, ...

Year of establishment.

Refrigerating capacity at design operating conditions:

Current refrigerant.

Compressor:

  • Model, manufacturer, year of manufacture.

Solenoid valves:

  • Model, manufacturer, ...

Pressure controls:

  • Evaporator pressure, crankcase pressure, condenser pressure controllers aso.
  • Model, manufacturer, ...

Filter drier:

  • Model, manufacturer, ...

Heat exchangers (evaporators, condensers, desuperheaters, internal heat exchangers, ...):

  • Design, operation in counter flow, parallel flow or other.
  • Model, manufacturer.

Oil:

  • Type, manufacturer.
  • Oil analysis for humidity, acid, colour aso. recommended.

Visible damages, dirt aso.

Checklist 2: Further preparations before retrofit

Choose new refrigerant (Refrigerant comparison to R22).

New refrigerant stickers.

Oil:

  • Oil change is recommended. Use only original oils which are compatible and proven with alternative refrigerants.

Compressor:

  • Manufacturer's statement on compatibility.
  • If necessary, new gaskets.

Expansion devices:

  • Manufacturer's statements on applicability, capacity adjustment, adjustment of superheat, ... (Vapour pressure tables).
  • New vapour pressure data for electronic expansion valves.

Solenoid valves:

  • Manfacturer's statement on compatibility.
  • If necessary, new gaskets.

Filter drier:

  • New filter drier is recommended.

Pressure controls:

  • Manfacturer's statement on compatibility.
  • If necessary, new gaskets.

For screw compressors the necessity to install or enlarge the oil cooler is checked. Calculations are done with the BITZER SOFTWARE.

Bottles for disposal or recycling of refrigerant.

Container/bottles for disposal of oil.

Availability of appropriate tools and test equipment.