Compressor repair with no Ex zone - exchange valve plate

Example task: Exchange of a valve plate on a semi-hermetic reciprocating compressor operated with A2L refrigerant R454C. The compressor is located on a rack in a machinery room.

Special tools or preconditions:

Working steps or preconditions:

  1. Educated worker
  2. Read / inform for risk assessment of system
  3. Have A2L fire extinguisher ready
  4. Put warning sign to notify work in progress, especially where refrigerant might be released
  5. Power off compressor / system
  6. Ventilation on
  7. a. Install extra fan
  8. Go in with gas detector / check regularly with gas detector or machinery room detector
  9. Close compressor shut off valves
  10. Release pressure
  11. a. Small gaseous amount to marked outside area
  12. Oil heater on
  13. Evacuate compressor
  14. a. Release vacuum pump outlet to marked outside area
  15. Charge compressor with Nitrogen
  16. Open compressor and replace valve plate
  17. a. Observe gas concentration at working place with mobile gas detector
  18. b. Stop work, if gas concentration reaches alarm level and wait for ventilation!
  19. Close compressor
  20. Check tightness with dry Nitrogen
  21. Evacuate compressor
  22. Open compressor shut off valves
  23. Remove warning signs
  24. Take compressor into operation again